AT&T fiber cabinet & cement pad up for review — Westwood Drive
Reviewed Jun 25 · outcome not yet confirmed
Every project links to the city packet it came from.
The Planning Commission approved a site plan for AT & T to install a new fiber cabinet and associated cement pad within an easement at 00000 Westwood Drive.
Excavation / gradingFlatwork (sidewalks, curbs, driveways)Low-voltage / data / security / AVHauling / truckingErosion & sediment control
- What happened
- The Planning Commission approved the site plan for AT & T to install a new fiber cabinet and cement pad within an easement at 00000 Westwood Drive.
- Why it matters
- This project requires excavation for the pad, concrete flatwork for the pad itself, and trenching/underground work for the fiber optic connections. This is a small but specific opportunity for sitework and concrete contractors, and low-voltage electricians for the final fiber installation.
- Timing
- With site plan approval, AT & T will likely proceed with permit applications. Construction could occur within the next few months.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: strongsville.org
