Cell tower antenna replacement up for review — 18900 Boston Road
Reviewed Jul 16 · outcome not yet confirmed
Every project links to the city packet it came from.
Site Plan approval was granted for AT&T to replace antennas and ancillary equipment on an existing cell tower, and to add a cabinet on the existing pad at 18900 Boston Road.
Low-voltage / data / security / AVCommercial / industrial electrical
- What happened
- The Strongsville Planning Commission approved a Site Plan for AT&T to upgrade an existing cell tower by replacing equipment and adding a new cabinet.
- Why it matters
- This project involves specialized low-voltage and electrical work for cell tower equipment, and potentially minor concrete flatwork for the new cabinet pad.
- Timing
- With Site Plan approval, the project can move forward with final engineering and permit applications. Work typically commences shortly after permits are issued, within 2-4 months.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: strongsville.org
