Construction projects approved in Sunbury, OH

Updated August 5, 2026

Every project links to the city packet it came from.

0 projects in the last 30 days: Excavation / grading, Commercial GC, Paving / asphalt. 9 on record.

Establishment of Designated Outdoor Refreshment Area (DORA)

Sunbury, OH

Reviewed Aug 5 · outcome not yet confirmed

Sunbury City Council approved Ordinance No. 2026.20 to establish a Designated Outdoor Refreshment Area (DORA) via emergency measure, expediting the process and …

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCSignageExcavation / grading

27-home subdivision approved — 1036 S State Rte 3C

Sunbury, OH

Reviewed May 18 · outcome not yet confirmed

A variance for cul-de-sac length was approved for the proposed 27-home Walnut Ridge subdivision, allowing the project to proceed with the planning and zoning co…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingFencingLandscaping / irrigationPaving / asphalt

Mixed-use commercial building up for review — 37 E Granville Street

Sunbury, OH

Reviewed Aug 5 · outcome not yet confirmed

Ordinance No. 2026.22, approving the major commercial and industrial site plan application for Trident Holding Company LLC for the construction of a new mixed-u…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofing

27-home subdivision approved — Old 3C Highway

Sunbury, OH

Reviewed May 26 · outcome not yet confirmed

A preliminary plat for a 27-home subdivision, Walnut Ridge by Drees Homes, was approved by the Planning and Zoning Commission. The project is located off Old 3C…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofing

Cheshire Road realignment opening — Sunbury

Sunbury, OH

Reviewed Aug 5 · outcome not yet confirmed

The new right-turn-only lane at the former Cheshire Road intersection is expected to open by Friday, pending installation of required stop signs. This marks the…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingTraffic control / flagging

State Route 37 widening funded — Sunbury

Sunbury, OH

Reviewed Aug 5 · outcome not yet confirmed

The City has been awarded a $1 million grant from the ODOT to support the State Route 37 widening project, providing significant funding for this initiative. Th…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingPaving / asphaltTraffic control / flaggingWater / sewer main

South Vernon Street reconstruction funded — Sunbury

Sunbury, OH

Reviewed Aug 5 · outcome not yet confirmed

South Vernon Street is scheduled for significant reconstruction between September and November as part of the City's street improvement program. This project is…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingPaving / asphaltTraffic control / flaggingWater / sewer main

Mountable curb installation coming — Cherry and Morning Street intersection

Sunbury, OH

Reviewed Aug 5 · outcome not yet confirmed

Installation of the mountable curb at the Cherry and Morning Street intersection is planned for October. This project involves concrete work and site modificati…

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Flatwork (sidewalks, curbs, driveways)Excavation / gradingTraffic control / flagging

North Miller Drive Lane reconfiguration coming — Sunbury

Sunbury, OH

Reviewed Aug 5 · outcome not yet confirmed

The North Miller Drive Lane reconfiguration is tentatively scheduled for Friday, weather permitting. This indicates upcoming work for street modifications.

Who controls the list now: No contractor selected yet — the applicant/owner is the contact.

Excavation / gradingPaving / asphaltStripingTraffic control / flagging