East Home Ave waterline replacement design coming
Reviewed Oct 1 · outcome not yet confirmed
Every project links to the city packet it came from.
A motion was presented to authorize an agreement with The Kleingers Group for engineering services to design the 2027 Home Avenue Water Service Replacement Project. The project scope includes replacing water services, resurfacing the roadway, repairing curbs and sidewalks, and making ADA improvements along East Home Avenue.
Budget: $33K
Water / sewer mainExcavation / gradingFlatwork (sidewalks, curbs, driveways)Paving / asphaltHauling / truckingErosion & sediment control
- What happened
- City Council discussed a motion to authorize an agreement for engineering services for the 2027 Home Avenue Water Service Replacement Project. This involves design work for future water line, street, and sidewalk improvements.
- Why it matters
- The engineering design is the first step for a significant public infrastructure project. Once designed, the project will require contractors for underground utilities, sitework, concrete flatwork, and paving. ADA improvements will be integrated into the scope.
- Timing
- Council is considering authorizing the design agreement. Once authorized, design typically takes several months, followed by a bid process for construction in 2027.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: trentonoh.gov
