Paving and infrastructure work — Bernhard Road
Reviewed Aug 25 · outcome not yet confirmed
Every project links to the city packet it came from.
Crews are progressing on paving and milling work towards Mound Street, with Bernhard Road paving anticipated. Recent work on Doney Street encountered a waterline issue requiring repair, and a sanitary infrastructure issue was identified on Mound Street. This indicates ongoing street and utility work in the area.
Paving / asphaltFlatwork (sidewalks, curbs, driveways)Excavation / gradingHauling / truckingTraffic control / flaggingWater / sewer main
- What happened
- Director Rowlands reported on ongoing paving and milling work on Doney Street, which is progressing towards Mound Street and Bernhard Road. Utility issues were encountered, indicating related infrastructure work.
- Why it matters
- Paving, milling, and potential utility repairs are part of the scope for Bernhard Road. This involves excavation, utility work, and concrete for infrastructure, in addition to paving.
- Timing
- Work is currently progressing towards Bernhard Road; specific timing for that section was not given but it is imminent.
Who to call
No contractor selected yet — the applicant/owner is the contact.