95-lot townhome development concept plan approved — Riverland Oaks
Approved Jul 15 · confirmed in minutes
Every project links to the city packet it came from.
The Planning Commission approved the concept plan for a 95-lot townhome development on 27.82 acres. The project has undergone extensive review and is designed to meet current city standards.
Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalRoofingFire sprinklerCommercial HVAC
- What happened
- The Planning Commission unanimously approved the concept plan for a 95-lot townhome development at Riverland Oaks. This approval allows the project to advance to more detailed review stages.
- Why it matters
- Concept plan approval for a 95-lot townhome development signifies significant future work for multiple trades. This includes extensive site work, tree removal, excavation, concrete foundations, utility installations (water, sewer, electric), new building construction for 95 units, paving for roads and driveways, and significant landscaping, including stormwater management features. Post-construction, ongoing cleaning services will be required.
- Timing
- With concept plan approval, the project will now proceed to the Technical Review Committee (TRC) for in-depth review, including traffic impact studies, detailed engineering for streets, trees, sidewalks, and utilities. This process can take several months before final permits are issued.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: charleston-sc.gov
