Commercial building demolition review — 34 Pitt St
Up for review Oct 22
Every project links to the city packet it came from.
An application has been submitted requesting approval for the demolition of the existing one-story wood framed commercial structure at 34 Pitt Street.
DemolitionCommercial GCRough framingRestoration / tuckpointingRoofingResidential windows
- What happened
- A structural assessment and demolition application were filed for the commercial building at 34 Pitt St following severe window, framing, and roof degradation.
- Why it matters
- Demolition review clears the way for site teardown and subsequent commercial rebuilding or structural overhaul.
- Timing
- The item is scheduled before the Board of Architectural Review, after which demolition or reconstruction contracts will be finalized.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: charleston-sc.gov
