Drainage improvements engineering up for review — Lake Dotterer
Up for review Oct 27
Every project links to the city packet it came from.
Approval of Fee Amendment #3 with Thomas & Hutton in the amount of $28,700.00 for surveying services at Mariners Ferry for the Lake Dotterer and Longbranch Creek Drainage Improvements project.
Budget: $29K
Storm drainageExcavation / grading
- What happened
- Council approved a fee amendment to add surveying services to the Thomas & Hutton engineering contract for drainage improvements.
- Why it matters
- Advances survey and engineering pre-construction work for stormwater and drainage infrastructure slated for in-house construction.
- Timing
- Surveying and engineering prep are active; in-house construction to follow.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: charleston-sc.gov
