Lowline parking lots sidewalk install up for review — King St/Sheppard St

Reviewed Jul 14 · outcome not yet confirmed

Every project links to the city packet it came from.

Change Order #4 for the Lowline Parking Lots project was approved, adding $6,607.23 for the installation of a new sidewalk connecting an existing concrete pad near King St at Sheppard St to a new asphalt apron on the north side of Huger St. The change order increases the total GMP contract to $8,341,666.52.

Budget: $7K

Flatwork (sidewalks, curbs, driveways)Paving / asphaltExcavation / gradingPower washing / pressure cleaning
What happened
The Committee on Ways and Means approved a change order for $6,607.23 for edifice, LLC, to install a new sidewalk and asphalt apron connection near King St and Huger St as part of the Lowline Parking Lots project.
Why it matters
This involves new sidewalk and asphalt installation work. The current contractor, edifice, LLC, may need subcontractors for concrete and paving work. Surface cleaning may be needed post-installation.
Timing
The change order has been approved, so the additional work is likely to commence soon as part of the ongoing project.

Who to call

No contractor selected yet — the applicant/owner is the contact.