Lowline parking lots sidewalk install up for review — King St/Sheppard St
Reviewed Jul 14 · outcome not yet confirmed
Every project links to the city packet it came from.
Change Order #4 for the Lowline Parking Lots project was approved, adding $6,607.23 for the installation of a new sidewalk connecting an existing concrete pad near King St at Sheppard St to a new asphalt apron on the north side of Huger St. The change order increases the total GMP contract to $8,341,666.52.
Budget: $7K
Flatwork (sidewalks, curbs, driveways)Paving / asphaltExcavation / gradingPower washing / pressure cleaning
- What happened
- The Committee on Ways and Means approved a change order for $6,607.23 for edifice, LLC, to install a new sidewalk and asphalt apron connection near King St and Huger St as part of the Lowline Parking Lots project.
- Why it matters
- This involves new sidewalk and asphalt installation work. The current contractor, edifice, LLC, may need subcontractors for concrete and paving work. Surface cleaning may be needed post-installation.
- Timing
- The change order has been approved, so the additional work is likely to commence soon as part of the ongoing project.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: charleston-sc.gov