Maybank Subdivision PUD development coming — Johns Island
Reviewed Aug 19 · outcome not yet confirmed
Every project links to the city packet it came from.
Civil concept construction drawings for the Maybank Subdivision Planned Unit Development (PUD ID # PUD2026-000033), proposing 62 residential lots (30 single-family detached units and 32 townhomes) plus 1 commercial district across 15.61 gross acres.
Home builder / residential GCExcavation / gradingLand clearing / tree serviceWater / sewer mainStorm drainageFlatwork (sidewalks, curbs, driveways)
- What happened
- Civil concept construction drawings and PUD plans were prepared for the Maybank Subdivision project, currently under review for permit submittal.
- Why it matters
- Extensive sitework, clearing, underground utility installation, and residential building construction will be required to develop the 62-lot subdivision.
- Timing
- Plans are proceeding through permit review and preliminary design stages ahead of construction document finalization and site work bidding.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: charleston-sc.gov
