7-Eleven site, landscape, architecture review — 1515 N Highway 17
Up for review Sep 30
Every project links to the city packet it came from.
The Commercial Design Review Board is conducting a final review of the site, landscape, and architectural plans for revisions to the existing 7-Eleven property. This indicates potential site work and architectural modifications.
Commercial GCLandscaping / irrigation
- What happened
- The Commercial Design Review Board is scheduled for a final review of revisions to the site, landscape, and architecture for the 7-Eleven at 1515 N Highway 17.
- Why it matters
- Final review of architectural and site plans signals that detailed design is largely complete, and construction could follow approval. This affects general contractors and landscaping trades.
- Timing
- A final design review approval typically precedes permitting and construction bidding. If approved, permit applications would likely be filed in the coming weeks to months.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: tompsc.com
