Primary structure and garage renovations under review — 242 Middle St
Up for review Nov 9
Every project links to the city packet it came from.
Preliminary review scheduled for primary structure and accessory garage renovations along with hardscapes at 242 Middle St.
Home builder / residential GCRough framingLandscaping / irrigationFlatwork (sidewalks, curbs, driveways)
- What happened
- A preliminary review is scheduled before the Historic District Preservation Commission for renovations to a primary structure, an accessory garage, and associated hardscapes.
- Why it matters
- Residential general contracting, framing, and exterior site hardscape trades will be required for the renovation scope.
- Timing
- Preliminary review is the first step in the design review cycle, followed by final review and permitting.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: tompsc.com
Related projects in Mount Pleasant
- Historic structure porch addition under review — 328 Bennett StNov 9
- Primary structure framing rebuild under review — 507 Whilden StNov 9
- Historic garage addition under review — 728 Pitt StNov 9
- Demolition and new primary structure build under review — 320 Morrison StNov 9
- New primary structure construction under review — 108 Beach StNov 9
