106 single-family lots development approved — Miller Farms
Approved May 11 · confirmed in minutes
Every project links to the city packet it came from.
A Final Development Plan for Miller Farms, consisting of 106 single-family lots, was approved with conditions by the Planning and Zoning Commission. The plan includes utility work, tree planting, sidewalks, road widening, and a shelter structure.
Excavation / gradingFlatwork (sidewalks, curbs, driveways)Commercial GCFencingLandscaping / irrigationPaving / asphalt
- What happened
- The Planning and Zoning Commission approved the Final Development Plan for Miller Farms, a 106-lot single-family subdivision. The plan was revised from a previous approval to adjust lot sizes.
- Why it matters
- The project includes extensive site development, such as utility installation, sidewalk construction, road widening, landscaping (171 street trees), and infrastructure for a new residential community. This will require general contractors, site work contractors, utility contractors, pavers, and landscapers.
- Timing
- The Final Development Plan has been approved by the Planning Commission and is recommended to City Council for final approval. Once approved by Council, site work and infrastructure development can proceed, with building permits for Phase 2 contingent on Oregon Road widening.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
