The Planning and Zoning Commission granted a variance to Molto Canal Pointe II LLC to replace an existing storm pipe with a new, larger box culvert at 7550 Robinett Way. This upgrade is necessary for a new access drive supporting a large industrial building, creating opportunities for heavy civil and site work contractors.
Excavation / gradingFlatwork (sidewalks, curbs, driveways)Hauling / truckingPaving / asphaltWater / sewer main
- What happened
- The Planning and Zoning Commission granted a variance to replace an existing storm pipe with a larger box culvert at 7550 Robinett Way.
- Why it matters
- Culvert upgrade supports a new access drive for a large industrial building, creating heavy civil, excavation, and paving packages.
- Timing
- Variance approval allows final civil engineering sign-off, with construction expected to start within 30 to 60 days.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
Related projects in Canal Winchester
- Commercial build-out up for review — 25 North High StreetOct 12
- Clubhouse redesign up for review — 6700 Nathan Drive (6700)Oct 12
- Residential build-out up for review — 5593 Hayes RoadOct 5
- Box culvert replacement up for review — Robinett WayOct 12
- Residential addition variance up for review — Charleton CourtAug 17