Canal Winchester, OH

Box culvert replacement up for review — 7550 Robinett Way

Reviewed Oct 12 · outcome not yet confirmed

Every project links to the city packet it came from.

The Planning and Zoning Commission granted a variance to Molto Canal Pointe II LLC to replace an existing storm pipe with a new, larger box culvert at 7550 Robinett Way. This upgrade is necessary for a new access drive supporting a large industrial building, creating opportunities for heavy civil and site work contractors.

Excavation / gradingFlatwork (sidewalks, curbs, driveways)Hauling / truckingPaving / asphaltWater / sewer main
What happened
The Planning and Zoning Commission granted a variance to replace an existing storm pipe with a larger box culvert at 7550 Robinett Way.
Why it matters
Culvert upgrade supports a new access drive for a large industrial building, creating heavy civil, excavation, and paving packages.
Timing
Variance approval allows final civil engineering sign-off, with construction expected to start within 30 to 60 days.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: canalwinchesterohio.gov

Related projects in Canal Winchester