Clubhouse redesign up for review — 6700 Nathan Drive (6700)
Reviewed Oct 12 · outcome not yet confirmed
Every project links to the city packet it came from.
Lock Pointe Village LLC received approval for a redesigned clubhouse at 6700 Nathan Drive, increasing its size, adding interior features like pool showers and a sports simulator, and expanding outdoor amenities to include a new pool shape, pergola, fire pit, hammocks, and putting green.
Commercial GCLandscaping / irrigationCommercial plumbingCommercial / industrial electricalBrickPainting / coatings
- What happened
- Lock Pointe Village LLC received planning commission approval for a clubhouse redesign, interior amenity expansion, and outdoor pool and recreation area construction.
- Why it matters
- The broad scope requires commercial general contracting, MEP trades for pool showers and sports simulators, flatwork, landscaping, and finish trades.
- Timing
- Approvals are secured; building permit applications and contractor bidding generally follow within 30 to 60 days.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
Related projects in Canal Winchester
- Commercial build-out up for review — 25 North High StreetOct 12
- Box culvert replacement up for review — 7550 Robinett WayOct 12
- Clubhouse redesign up for review — Lock Pointe VillageOct 12
- Residential build-out up for review — 5593 Hayes RoadOct 5
- Residential addition variance up for review — Charleton CourtAug 17
