The Landmarks Commission approved modifications to the front steps and railing at 79 N High Street, including removing sections of railing, replacing steps with pressure-treated cedar, and adding a new metal rail with specific conditions.
Commercial GCPainting / coatings
- What happened
- The Landmarks Commission approved modifications to the front porch steps and railing at 79 N High Street. This involves removing existing railing sections, replacing uneven and damaged steps with pressure-treated cedar, and installing a new metal rail with two legs and a top rail, but no spindles. Everything will be painted to match the current porch.
- Why it matters
- This project requires demolition of existing elements, carpentry for new steps, installation of metal railing, and painting of the new and existing porch elements. Power Washing will be needed post-construction clean-up.
- Timing
- The approval occurred on April 27, 2026. Construction can proceed after final permitting is secured.