Canal Winchester, OH

New doors up for review — 153 Washington Street

Reviewed May 26 · outcome not yet confirmed

Every project links to the city packet it came from.

The Landmarks Commission approved the replacement of the front door with a new ¾ lite fiberglass door with sidelites, and the kitchen door with a new ¾ lite steel door and fixed transom, at 153 Washington Street.

Commercial GC
What happened
The Landmarks Commission approved the replacement of the front and kitchen doors at 153 Washington Street. The front door will be a new ¾ lite fiberglass door with sidelites, and the kitchen door will be a new ¾ lite steel door with a fixed transom.
Why it matters
This project requires a contractor for the removal of existing doors and the installation of new doors and a transom.
Timing
The approval occurred on April 27, 2026. Construction can proceed after final permitting is secured.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: canalwinchesterohio.gov

Related projects in Canal Winchester