Residential sidewalk up for review — 160 Kramer Street
Reviewed May 11 · outcome not yet confirmed
Every project links to the city packet it came from.
A variance was approved to not install a sidewalk at 160 Kramer Street for a new single-family home. The variance was granted because neighboring properties lack sidewalks, preventing a disconnected infrastructure.
Flatwork (sidewalks, curbs, driveways)Excavation / grading
- What happened
- The Planning and Zoning Commission approved a variance request to waive the sidewalk installation requirement for a new single-family home at 160 Kramer Street. This facilitates the residential building permit.
- Why it matters
- The approval means the new single-family home construction can proceed. While a sidewalk is waived, general contractors for residential builds, and potentially other site work trades, will be needed for the home construction.
- Timing
- The variance has been approved; a residential building permit application for the new home can now advance.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
