Retail building redesign coming — Diley Rd and Meijer
Reviewed Aug 17 · outcome not yet confirmed
Every project links to the city packet it came from.
A multi-tenant building project at Diley Road and Meijer, previously stalled, is now back on the docket with the same developer but redesigned as a two-tenant building (one food-related, one non-food-related).
Commercial GCCommercial / industrial electricalFire sprinklerCommercial HVACPainting / coatingsBrick
- What happened
- A previously discussed multi-tenant retail building project is being revived and redesigned. This indicates renewed commitment to construction at this location.
- Why it matters
- The redesign and reintroduction of the project mean new general construction, interior fit-outs for the two tenants, and associated site work, paving, and landscaping will be required. Post-construction cleaning will also be needed.
- Timing
- The project is back on the docket and being redesigned, suggesting construction could begin within 6-12 months once plans are finalized and permits are secured.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
