Canal Winchester, OH

Single-family development up for review — Miller Farms Subarea A

Reviewed Jun 1 · outcome not yet confirmed

Every project links to the city packet it came from.

A revised final development plan for Subarea A of Miller Farms single-family development was approved, reducing the number of lots from 118 to 106 to accommodate wider homes. This approval includes conditions for sidewalk connectivity, road widening, and public access easements.

Commercial GCFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalFencingLandscaping / irrigationPaving / asphalt
What happened
City Council approved a revised final development plan for Subarea A of Miller Farms, a single-family residential development.
Why it matters
This approval means the project is cleared for development. It will require general construction, extensive site work, utility installation, landscaping (including tree planting), concrete for sidewalks, paving for roads, fencing, and signage. Lighting installation is also included.
Timing
The final development plan is approved. Road widening on Oregon Road must occur prior to building permits for Phase Two of Subarea A, and public access easements must be recorded before building occupancy. Construction is likely to begin within the next 6-12 months following final engineering and permitting.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: canalwinchesterohio.gov

Related projects in Canal Winchester