US Route 33 widening up for review — Canal Winchester
Reviewed Aug 3 · outcome not yet confirmed
Every project links to the city packet it came from.
The City Council authorized the Mayor to enter into contracts with the Ohio Director of Transportation for the widening of US Route 33. This project will expand the eastbound lanes from two to three, between Gender Road and I-270, with construction expected to begin in Fall 2027.
Paving / asphaltFlatwork (sidewalks, curbs, driveways)StripingExcavation / gradingTraffic control / flagging
- What happened
- City Council approved authorizing the Mayor to contract with ODOT for the widening of US Route 33, expanding the eastbound lanes from two to three between Gender Road and I-270.
- Why it matters
- This signifies a major road infrastructure project. Contractors specializing in road construction, paving, excavation, concrete work for a center wall, and traffic control should anticipate future bidding opportunities.
- Timing
- Construction is expected to begin in Fall 2027 and take about two years. Further details and bidding information will emerge closer to the construction start date.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
