Canal Winchester, OH

WRF Headworks Replacement forming foundation — Canal Winchester

Reviewed Aug 3 · outcome not yet confirmed

Every project links to the city packet it came from.

Kokosing Industrial is continuing to form and pour foundation walls for the Water Reclamation Facility (WRF) Headworks Replacement project.

Flatwork (sidewalks, curbs, driveways)Commercial GCExcavation / gradingWater / sewer main
What happened
Kokosing Industrial is currently performing concrete forming and pouring for foundation walls at the Water Reclamation Facility Headworks Replacement project.
Why it matters
This is an active construction project for which the general contractor (Kokosing Industrial) is known. Subcontractors for concrete, site work, and potentially other specialized trades could inquire about remaining scope.
Timing
Construction is currently underway, with foundation work progressing.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: canalwinchesterohio.gov

Related projects in Canal Winchester