Multi-tenant building up for review — 6285 Sawmill Rd
Reviewed Oct 1 · outcome not yet confirmed
Every project links to the city packet it came from.
A Preliminary Development Plan was approved for Aura Dublin at 6285 Sawmill Road, detailing a new multi-tenant building and comprehensive site improvements.
Commercial GCExcavation / gradingFlatwork (sidewalks, curbs, driveways)BrickCommercial / industrial electricalCommercial plumbing
- What happened
- The planning commission approved a Preliminary Development Plan for a new multi-tenant building and site improvements at 6285 Sawmill Road.
- Why it matters
- Preliminary plan approval means civil engineering, architectural, and structural design scopes are advancing. This triggers the need for site excavation, utility connections, foundation work, shell construction, and MEP rough-ins.
- Timing
- Final development plan submittal and building permit applications typically follow within 3 to 6 months.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: dublinohiousa.gov
Related projects in Dublin
- Stormwater basin maintenance contract approved — DublinSep 28
- Storm structure maintenance contract approved — DublinSep 28
- Annual storm structure maintenance project awarded — DublinSep 28
- Annual stormwater management basin maintenance awarded — DublinSep 28
- Vista Community Church – Pickleball CourtsOct 15
