New single-family home approved — 7029 Rings Road
Approved Aug 17 · confirmed in minutes
Every project links to the city packet it came from.
The Washington Township Architectural Review Board approved a Zoning Certificate for the construction of a new farmhouse-style single-family home at 7029 Rings Road. The owners have already secured septic and water permits and hired a civil engineer for a drainage plan.
Home builder / residential GCFoundations / footingsRough framingRoofingExcavation / gradingWater / sewer main
- What happened
- The Washington Township Architectural Review Board, sitting as the Zoning Commission, granted comprehensive approval for a Zoning Certificate for a new single-family home. This approval allows the project to move forward with building permit applications.
- Why it matters
- Approval of the Zoning Certificate means the general contractor and various trades (sitework, foundations, framing, roofing, plumbing, electrical, HVAC, and finishes) are needed for the construction of a new custom home. The mention of a civil engineer for drainage also indicates sitework and underground utility needs.
- Timing
- With Architectural Review Board approval, the next step would typically be to finalize engineering and architectural plans for a building permit application, likely within the next 3-6 months.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: wtwpdublinoh.gov
