Lancaster, OH

Tiki Lane waterline replacement project up for review — Lancaster

Reviewed Oct 12 · outcome not yet confirmed

Every project links to the city packet it came from.

The City Council approved Resolution Temporary 86-26 authorizing a contract for the construction of the Tiki Lane Waterline Replacement Project as it moves into its final construction phase.

Water / sewer mainExcavation / gradingFlatwork (sidewalks, curbs, driveways)Paving / asphalt
What happened
City Council passed Resolution Temporary 86-26, authorizing the service-safety director to enter into a contract for construction of the Tiki Lane Waterline Replacement Project.
Why it matters
Waterline replacement requires trenching, pipe installation, and subsequent surface restoration including flatwork and paving.
Timing
With the resolution passed following design and bidding, construction contract execution is immediate.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: lancasterohio.gov

Related projects in Lancaster