Middletown, OH

Cincinnati-Dayton Rd improvements design up for review — Middletown

Up for review Oct 20

Every project links to the city packet it came from.

The City Council is reviewing a motion to authorize a contract not-to-exceed $141,275 with Crawford, Murphy and Tilly, Inc. for the design of the Cincinnati-Dayton Road Improvements project. The 2-mile resurfacing project from SR 122 south to the city limits includes milling, full-depth base repairs, curb, gutter, and driveway apron restoration, and handicap ramp upgrades.

Budget: $141K

Flatwork (sidewalks, curbs, driveways)StripingExcavation / gradingTraffic control / flagging
What happened
City Council is scheduled to vote on authorizing a design contract with Crawford, Murphy and Tilly, Inc. for the Cincinnati-Dayton Road Improvements.
Why it matters
Design approval initiates the engineering phase for a major two-mile roadway resurfacing, curb replacement, and handicap ramp upgrade project, which will subsequently tender construction packages for paving and concrete trades.
Timing
Design contract authorization is scheduled for the October 20, 2026 meeting, with construction bidding expected following design completion and OPWC funding finalization.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: cityofmiddletown.org

Related projects in Middletown