Middletown, OH

Cincinnati-Dayton Rd. street improvements up for review — Middletown

Up for review Oct 20

Every project links to the city packet it came from.

The City authorized a design contract with Crawford, Murphy and Tilly, Inc. for the resurfacing and reconstruction of a two-mile section of Cincinnati-Dayton Rd from SR 122 south to the city limits. The project includes 3-inch mill and fill, spot full-depth base repairs, curb, gutter, and driveway apron restoration, handicap ramp upgrades, and radar-based vehicle detection upgrades at five traffic signals.

Budget: $3.5M

Flatwork (sidewalks, curbs, driveways)Erosion & sediment controlLow-voltage / data / security / AVTraffic control / flagging
What happened
City Council authorized a design contract with Crawford, Murphy and Tilly, Inc. for the Cincinnati-Dayton Road Improvements project.
Why it matters
Design approval initiates engineering for a 2-mile mill-and-fill resurfacing project involving concrete flatwork, curb and gutter repairs, and traffic signal upgrades, setting up future construction bidding.
Timing
Design is slated through 2026-2027 in preparation for OPWC grant funding and subsequent construction bidding.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: cityofmiddletown.org

Related projects in Middletown