New Albany, OH

Bank drive-through up for review — Johnstown Rd

Up for review Nov 16

Every project links to the city packet it came from.

Allegro Engineers, represented by Carter Sandstrom, received conditional use approval for three drive-throughs for a Huntington National Bank financial institution on 1.092+/- acres at the intersection of Johnstown Road and Woodcrest Way.

Commercial GCExcavation / gradingPaving / asphaltFlatwork (sidewalks, curbs, driveways)Commercial / industrial electrical
What happened
Conditional use approval was granted for three drive-throughs for a new financial institution.
Why it matters
Drive-through approval clears the way for site civil work, heavy excavation, paving, and commercial GC coordination.
Timing
Conditional use is approved; construction drawings and building permits typically follow within 60-120 days.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: newalbanyohio.org

Related projects in New Albany