Bank drive-through up for review — Johnstown Rd & Woodcrest Way
Up for review Nov 16
Every project links to the city packet it came from.
The Planning Commission approved a conditional use for three drive-throughs for a Huntington National Bank financial institution, requested by Allegro Engineers c/o Carter Sandstrom, at the intersection of Johnstown Road and Woodcrest Way.
Excavation / gradingPaving / asphaltFlatwork (sidewalks, curbs, driveways)Commercial / industrial electricalLandscaping / irrigation
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: newalbanyohio.org
Related projects in New Albany
- Road dedication up for review — Lucille Lynd RoadNov 16
- Roof material modification up for review — 4295 Harlem RoadNov 16
- Wall signs up for review — 9930 Johnstown Road (9930)Nov 16
- Lucille Lynd Rezoning - Beech Interchange Southeast Expansion Too Zoning DistrictOct 19
- Bank conditional use under review — Johnstown RdNov 16
