Huntington Bank Drive-Through Conditional Use
Up for review Nov 16
Every project links to the city packet it came from.
Allegro Engineers received conditional use approval for a Huntington National Bank to include three drive-throughs at the intersection of Johnstown Road and Woodcrest Way.
Commercial GCExcavation / gradingFlatwork (sidewalks, curbs, driveways)Paving / asphaltCommercial / industrial electricalCommercial plumbing
- What happened
- Conditional use approval was granted for a Huntington National Bank featuring three drive-through lanes.
- Why it matters
- Approval clears the site configuration for civil engineering, paving, concrete flatwork, and commercial building trades to support the drive-through infrastructure.
- Timing
- Engineering plans must be finalized for building and civil permits, with contractor bidding expected within 60-90 days.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: newalbanyohio.org
Related projects in New Albany
- Snow removal agreement up for review — Mink St & Green Chapel RdNov 3
- Fire Station 122 construction underway — New AlbanyOct 7
- Industrial rezoning up for review — 0 Lucille Lynd Rd (0)Oct 19
- Signage installation up for review — 9930 Johnstown RdNov 16
- Multi-unit residential development rezoning — 5953-6065 Central College RdNov 19
