New Albany, OH

Huntington Bank Drive-Through Conditional Use

Up for review Nov 16

Every project links to the city packet it came from.

Allegro Engineers received conditional use approval for a Huntington National Bank to include three drive-throughs at the intersection of Johnstown Road and Woodcrest Way.

Commercial GCExcavation / gradingFlatwork (sidewalks, curbs, driveways)Paving / asphaltCommercial / industrial electricalCommercial plumbing
What happened
Conditional use approval was granted for a Huntington National Bank featuring three drive-through lanes.
Why it matters
Approval clears the site configuration for civil engineering, paving, concrete flatwork, and commercial building trades to support the drive-through infrastructure.
Timing
Engineering plans must be finalized for building and civil permits, with contractor bidding expected within 60-90 days.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: newalbanyohio.org

Related projects in New Albany