Road plat up for review — Lucille Lynd Road
Up for review Nov 16
Every project links to the city packet it came from.
EMHT, represented by Nicholas Ovens, received approval for a right-of-way dedication and final road plat for Lucille Lynd Road, encompassing 3.028+/- acres, setting the stage for future road construction.
Paving / asphaltExcavation / gradingWater / sewer mainLandscaping / irrigationHauling / trucking
- What happened
- EMHT, represented by Nicholas Ovens, secured approval for a right-of-way dedication and final road plat for Lucille Lynd Road spanning 3.028 acres.
- Why it matters
- Plat and right-of-way approval precedes civil site construction, involving excavation, paving, underground utilities, landscaping, and hauling.
- Timing
- Final plat approval allows immediate advancement to construction drawing sign-offs and site prep bidding.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: newalbanyohio.org
