The City approved the acceptance of a permanent drainage easement on TMS#340-03-00-012, facilitating drainage improvements at 1850 Central Park Road.
Excavation / gradingWater / sewer mainFlatwork (sidewalks, curbs, driveways)
- What happened
- The City approved the acceptance of a permanent drainage easement to facilitate drainage improvements at 1850 Central Park Road.
- Why it matters
- Easement acquisition allows sitework, excavation, and underground utility installation to proceed on the designated parcel. Surface restoration and concrete flatwork will follow the primary earthwork.
- Timing
- Engineering and project scoping typically follow easement acceptance within 30 to 60 days.