EV charging stations coming — Grove St & Rutledge Ave
Reviewed Sep 21 · outcome not yet confirmed
Every project links to the city packet it came from.
The City approved an amendment to a lease agreement with Dominion Energy South Carolina to remove 12 parking spaces at the Grove and Rutledge lot for the installation of electric vehicle charging stations.
Commercial / industrial electricalPaving / asphaltStripingFlatwork (sidewalks, curbs, driveways)Excavation / grading
- What happened
- The City approved a lease amendment with Dominion Energy South Carolina to remove 12 parking spaces at Grove and Rutledge for EV charging stations.
- Why it matters
- Installation requires electrical trenching, concrete flatwork for equipment pads, asphalt paving modifications, and line striping.
- Timing
- Construction documents and contractor procurement typically proceed within 30 to 60 days of lease modification.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: charleston-sc.gov