A variance application has been filed to replace an existing 48-inch storm pipe with a new 24-foot by 5-foot box culvert in support of a new 210,748-square-foot speculative industrial building access drive.
Storm drainageExcavation / gradingErosion & sediment controlStructural / formed concrete
- What happened
- A variance request (VA-26-018) was submitted to allow stream corridor alterations for replacing an undersized 48-inch farm culvert with a larger box culvert for industrial truck access.
- Why it matters
- Civil engineering and site prep work will involve major excavation, stormwater installation, and structural concrete work for the culvert crossing.
- Timing
- The variance is scheduled for public hearing review before the Planning and Zoning Commission on October 12, 2026.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
Related projects in Canal Winchester
- Commercial build-out up for review — 25 North High StreetOct 12
- Clubhouse redesign up for review — 6700 Nathan Drive (6700)Oct 12
- Box culvert replacement up for review — 7550 Robinett WayOct 12
- Residential build-out up for review — 5593 Hayes RoadOct 5
- Residential addition variance up for review — Charleton CourtAug 17