Canal Winchester, OH

Industrial site improvements up for review — 6270 Bowen Road

Reviewed Sep 14 · outcome not yet confirmed

Every project links to the city packet it came from.

A variance has been approved allowing site improvements including the installation of an 8-foot to 12-foot wood privacy fence, equipment storage areas, and restriping of existing asphalt parking for New River Electric Corp.

FencingPaving / asphaltStripingExcavation / grading
What happened
The Planning and Zoning Commission approved variance application VA-26-017 for New River Electric to install perimeter fencing and restripe parking surfaces within 45 days.
Why it matters
Site fencing installation and parking lot restriping work must be completed promptly to satisfy the 45-day condition of approval.
Timing
Variance was approved on September 14, 2026, with a 45-day completion window mandated for site improvements.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: canalwinchesterohio.gov

Related projects in Canal Winchester