Park shed construction up for review — 9571 Busey Road
Reviewed Sep 14 · outcome not yet confirmed
Every project links to the city packet it came from.
A final development plan has been recommended for approval to construct a new 100-square-foot wood storage shed featuring T1-11 wood siding, a gravel floor, and asphalt shingle roof at Busey Road Park.
Rough framingSiding / claddingRoofingFlatwork (sidewalks, curbs, driveways)
- What happened
- The Planning and Zoning Commission recommended City Council approval for Final Development Plan FDP-26-003 to build a 100-sq.-ft. storage shed in Busey Road Park.
- Why it matters
- Small structure assembly requires rough framing, wood siding, and roofing trades.
- Timing
- The application received commission recommendation on September 14, 2026 and proceeds to City Council for final adoption.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: canalwinchesterohio.gov
Related projects in Canal Winchester
- Commercial build-out up for review — 25 North High StreetOct 12
- Clubhouse redesign up for review — 6700 Nathan Drive (6700)Oct 12
- Box culvert replacement up for review — 7550 Robinett WayOct 12
- Residential build-out up for review — 5593 Hayes RoadOct 5
- Residential addition variance up for review — Charleton CourtAug 17
