Employment zoning up for review — 0 Lucille Lynd Rd
Reviewed Oct 19 · outcome not yet confirmed
Every project links to the city packet it came from.
The New Albany Planning Commission approved the rezoning of 0.3 acres at 0 Lucille Lynd Road from Agriculture to Limited General Employment, applied for by MBJ Holdings, for future development.
Commercial GCExcavation / gradingWater / sewer mainFlatwork (sidewalks, curbs, driveways)Demolition
- What happened
- The Planning Commission approved the rezoning of a 0.3-acre parcel from Agriculture to Limited General Employment for the Beech Interchange Southeast Expansion Too project.
- Why it matters
- Rezoning to Limited General Employment enables commercial and industrial site design, establishing the legal framework for sitework, utility connections, and structural scopes.
- Timing
- Civil engineering and formal development plans typically proceed within 3 to 6 months of rezoning approval.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: newalbanyohio.org
