51-unit residential final plat up for review — The Retreat at Hickory Lakes Section 2 Part B
Reviewed Sep 8 · outcome not yet confirmed
Every project links to the city packet it came from.
Final plat approved for 51 single-family homes in Section 2 Part B of The Retreat at Hickory Lakes.
Home builder / residential GCExcavation / gradingWater / sewer mainStorm drainageFoundations / footingsErosion & sediment control
- What happened
- The Pickerington Planning and Zoning Commission approved the final plat for 51 single-family lots in Section 2 Part B of The Retreat at Hickory Lakes.
- Why it matters
- Opens up another phase of residential lot development, requiring earthwork, utility mains, paving, and home construction trades.
- Timing
- Construction sequencing proceeds toward utility and infrastructure installation ahead of home building.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: public.destinyhosted.com
