Pickerington, OH

51-unit residential final plat up for review — The Retreat at Hickory Lakes Section 2 Part B

Reviewed Sep 8 · outcome not yet confirmed

Every project links to the city packet it came from.

Final plat approved for 51 single-family homes in Section 2 Part B of The Retreat at Hickory Lakes.

Home builder / residential GCExcavation / gradingWater / sewer mainStorm drainageFoundations / footingsErosion & sediment control
What happened
The Pickerington Planning and Zoning Commission approved the final plat for 51 single-family lots in Section 2 Part B of The Retreat at Hickory Lakes.
Why it matters
Opens up another phase of residential lot development, requiring earthwork, utility mains, paving, and home construction trades.
Timing
Construction sequencing proceeds toward utility and infrastructure installation ahead of home building.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: public.destinyhosted.com

Related projects in Pickerington