Pickerington, OH

Final plat up for review for The Retreat at Hickory Lakes Sec 2

Reviewed Oct 6 · outcome not yet confirmed

Every project links to the city packet it came from.

Ordinance 2026-23 advances the final plat approval for The Retreat at Hickory Lakes, Section 2, Part A, following review and recommendation by the Planning and Zoning Commission. Development conditions require adherence to detention basin standards and county utility requirements.

Home builder / residential GCExcavation / gradingWater / sewer mainStorm drainageFlatwork (sidewalks, curbs, driveways)Erosion & sediment control
What happened
City Council introduced Ordinance 2026-23 for the final plat of The Retreat at Hickory Lakes, Section 2, Part A.
Why it matters
Subdivision platting enables site servicing, grading, utility installation, and subsequent residential vertical construction.
Timing
Introduced at the October 6, 2026 meeting; final adoption follows standard council reading schedules.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: public.destinyhosted.com

Related projects in Pickerington