Final plat up for review for The Retreat at Hickory Lakes Sec 2
Reviewed Oct 6 · outcome not yet confirmed
Every project links to the city packet it came from.
Ordinance 2026-23 advances the final plat approval for The Retreat at Hickory Lakes, Section 2, Part A, following review and recommendation by the Planning and Zoning Commission. Development conditions require adherence to detention basin standards and county utility requirements.
Home builder / residential GCExcavation / gradingWater / sewer mainStorm drainageFlatwork (sidewalks, curbs, driveways)Erosion & sediment control
- What happened
- City Council introduced Ordinance 2026-23 for the final plat of The Retreat at Hickory Lakes, Section 2, Part A.
- Why it matters
- Subdivision platting enables site servicing, grading, utility installation, and subsequent residential vertical construction.
- Timing
- Introduced at the October 6, 2026 meeting; final adoption follows standard council reading schedules.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: public.destinyhosted.com
Related projects in Pickerington
- Final plat up for review for The Retreat at Hickory Lakes Sec 1Oct 6
- 34-unit residential final plat up for review — The Retreat at Hickory Lakes Section 2 Part ASep 8
- 51-unit residential final plat up for review — The Retreat at Hickory Lakes Section 2 Part BSep 8
- New 28,250 sq ft public library up for review — Refugee RdSep 8
- Jaggers sign plan up for review — 873 Refugee RdSep 8
