Pickerington, OH

Final plat up for review for The Retreat at Hickory Lakes Sec 1

Reviewed Oct 6 · outcome not yet confirmed

Every project links to the city packet it came from.

Ordinance 2026-22 advances the final plat approval for The Retreat at Hickory Lakes, Section 1, Part B, following a recommendation from the Planning and Zoning Commission. The project requires dedicated plats, stormwater detention compliance, and utility coordination.

Home builder / residential GCExcavation / gradingWater / sewer mainStorm drainageFlatwork (sidewalks, curbs, driveways)Erosion & sediment control
What happened
City Council received the first reading of Ordinance 2026-22 to approve the final plat for The Retreat at Hickory Lakes, Section 1, Part B.
Why it matters
Plat approval clears the way for final site infrastructure installation, utility connections, and residential home construction buildout.
Timing
First reading occurred on October 6, 2026; final council readings and statutory adoption typically proceed over subsequent legislative sessions.

Who to call

No contractor selected yet — the applicant/owner is the contact.

Named contact in the filing — locked

Unlock

Source: public.destinyhosted.com

Related projects in Pickerington