Final plat up for review for The Retreat at Hickory Lakes Sec 1
Reviewed Oct 6 · outcome not yet confirmed
Every project links to the city packet it came from.
Ordinance 2026-22 advances the final plat approval for The Retreat at Hickory Lakes, Section 1, Part B, following a recommendation from the Planning and Zoning Commission. The project requires dedicated plats, stormwater detention compliance, and utility coordination.
Home builder / residential GCExcavation / gradingWater / sewer mainStorm drainageFlatwork (sidewalks, curbs, driveways)Erosion & sediment control
- What happened
- City Council received the first reading of Ordinance 2026-22 to approve the final plat for The Retreat at Hickory Lakes, Section 1, Part B.
- Why it matters
- Plat approval clears the way for final site infrastructure installation, utility connections, and residential home construction buildout.
- Timing
- First reading occurred on October 6, 2026; final council readings and statutory adoption typically proceed over subsequent legislative sessions.
Who to call
No contractor selected yet — the applicant/owner is the contact.
Named contact in the filing — locked
UnlockSource: public.destinyhosted.com
Related projects in Pickerington
- 41-unit residential final plat up for review — The Retreat at Hickory Lakes Section 1 Part BSep 8
- Final plat up for review for The Retreat at Hickory Lakes Sec 2Oct 6
- 51-unit residential final plat up for review — The Retreat at Hickory Lakes Section 2 Part BSep 8
- New 28,250 sq ft public library up for review — Refugee RdSep 8
- Jaggers sign plan up for review — 873 Refugee RdSep 8
